No. | Project Description | Project Owner/ Client | Completion Year |
1. | Provision of QRA for the Gas & LNG Development Project for Nghi Son Petrochemical Utilities – Phase 1 | Anh Phát Cooperation | (in progress) |
2. | Provision of Safety Management Dossier for Approval of PVN & MOIT on drilling activities with two rigs offshore drilling campaign for well TTN-2X, TTN-3X, in Blocks 05.3/11 | Rosneft Vietnam B.V. | (in progress) |
3. | Provision of development of the Safety Management Documentation (QRA, SMP, SHE plan) for Sao Vang & Dai Nguyet. | Idemitsu Gas production (Vietnam) Co., Ltd. | (in progress) |
4. | Provision of Safety Management Dossier
(including QRA, SMP, ERP and Oil Spill Response Plan, Environmental Protection Plan) for Drilling Campaign, Block 12/11 |
VietsovPetro | (in progress) |
5. | Preparation and acquisition of MoIT approval Quantitative Risk Assessment for Western Terminal Oil | Petrolimex Cần Thơ | (in progress) |
6. | Provision of Legislations of Safety Management Program, develop Quantitative Risk Assessment and Emergency Response Plan for Drilling Campaign(s) in Hai Su Trang and/or Hai Su Den fields | Thang Long JOC | (in progress) |
7. | Provision of Developing and Update Operational Safety Case, QRA, HAZOP, HAZID, SIL and safety studies for FPSO MV34 | MODEC Offshore Production Systems (Singapore) Pte. Ltd | (in progress) |
8. | Provision of Safety Documentation Management Service for Block 06.1, PLDDC-1X Exploration Drilling Program | Rosneft Vietnam B.V. | 2019 |
9. | Preparation and acquisition of MoIT approval Quantitative Risk Assessment for Nha Be Terminal Oil | Petrolimex – Sai Gon | (in progress) |
10. | Provision of Update the Quantitative Risk Assessment for WHP-E1/E-1A and support in the approval process for updated QRA report, HAZID & Safety Management Program | Japan Vietnam Petroleum Company | 2019 |
11. | Provision of QRA service for Vinh Tan 2 Thermal Power Plant | Vinh Tan Thermal Power | (in progress) |
12. | Provision of HAZOP revalidation, Quantitative Risk Assessment, Safety Case Update and Integrity review service for WHP-MT1, WHP-HT1 and PQP-HT | Bien Dong POC | 2018 |
13. | Provision of Operation Safety Case Update for FSO PTSC Bien Dong | PTSC PPS | 2018 |
14. | Preparation and acquisition of MoIT approval Quantitative Risk Assessment for Duc Giang Terminal Oil, Jetty and Depot H101 and pipeline from H101 to Duc Giang | PETROLIMEX HA NOI | 2018 |
15. | Preparation and acquisition of MoIT/ PVN approval for Quantitative Risk Assessment for gas facilities PM3 – Ca Mau | PV Gas Ca Mau | 2018 |
16. | Preparation and acquisition of MoIT approval Quantitative Risk Assessment for Thuong Ly and An lac Oil Terminals | PETROLIMEX HAIPHONG | 2018 |
17. | Provision of consultancy service in obtaining the approval from PVN and MOIT for PLD Development Fabrication and Installation Activities and Update Safety Management Dossier for Lan Tay Platform Operation with PLD Modification at Block 6.1 | Rosneft Vietnam B.V. | 2018 |
18. | Provision of consultancy service in obtaining the approval from PVN and MOIT for safety Management Dossier including Risk Assessment report and safety management program for FSO Rang Dong MV17 mooring leg replacement Project | Japan Vietnam Petroleum Company | 2018 |
19. | Provision of Safety Management Dossier for Approval of PVN & MOIT on drilling activities with two rig offshore drilling campaign for well TTN-1X, PLD-1X and LND-3P in Blocks 05.3/11 and 06.1 in compliance with Decision 04/2015/QD-TTg | Rosneft Vietnam B.V. | 2017 |
20. | Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier for Gas Processing Plant | PV Gas Ca Mau | 2017 |
21. | Preparation and acquisition of MoIT/ PVN approval Quantitative Risk Assessment for Mao Khe Thermal Power Plant | Dong Trieu Thermal Power Company – Subsidiary of VINACOMIN | 2017 |
22. | Provision of Operation HSE Cases and QRA for Su Tu Field Facilities (include 5 Operation Safety Case WHP-A; WHP-B; STT Facilities; STV CPP; TBVN FPSO) | Cuu Long Joint Operating Company | 2017 |
23. | Provision of Safety and Environment Package acquisition of MoIT/ PVN approval for to Murphy’s 2017 Exploration Drilling Campaign – Phase 2 in Block 11-2/11 | Murphy Phuong Nam Oil Co., Ltd. | 2017 |
24. | Providing Consultancy Service to prepare the documents and support the process of getting these documents approved by Governmental and Safety Management Program on Field Development Project of STT Phase 1 | Cuu Long Joint Operating Company | 2017 |
25. | Provision of Safety Studies (HAZOP/HAZID/SIL/FEA/QRA) for H1-WHP platform modification – water treatment system | Hoang Long Joint Operating Company (HLJOC) | 2016 |
26. | Provision of Risk Assessment and acquisition of MoIT/ PVN approval for the prepared QRA for LPG Thang Long Gas | Industrial Safety Techniques and Environment Agency (ISEA) under MOIT | 2016 |
27. | Preparation of Operations HSE Case for CLJOC Su Tu Vang South West and Su Tu Vang North East Wellhead Platforms | Cuu Long Joint Operating Company (CLJOC) | 2015 |
28. | Provision of Update Operations Safety Case (including QRA, HAZOP, SCA, MOPO Studies) and acquisition of MoIT/ PVN approval for the prepared QRA for PTSC FPSO Ruby II | PTSC (Production Services) | 2016 |
29. | Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier (including SMP, QRA, and ERP) for TNK Vietnam 2016 Drilling Campaign | TNK Vietnam B.V (a subsidiary of Rosneft) | 2015 |
30. | Preparation of QRA for sulfur recovery unit at Dung Quat Refinery | Dung Quat Refinery/SGS Vietnam | 2015 |
31. | Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier (including QRA and SMP) for modifications of JVPC NULQ Platform | Japan Vietnam Petroleum Company (JVPC) | 2015 |
32. | Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier (including SMP, integrated QRA, and ERP) for operations at LSJOC Thang Long – Dong Do Field | Lam Son Joint Operating Company (LSJOC) | 2014 |
33. | Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier (including SMP and QRA) for CLJOC Su Tu Vang South West Platform | Cuu Long Joint Operating Company (CLJOC) | 2014 |
34. | Provision of Safety Studies (including QRA, HAZOP, HAZID) for VSP Wellhead Platform A (associated with Global Maritime Vietnam) | Vietsovpetro/PV Engineering | 2014 |
35. | Provision of Safety Studies (including QRA, EERA, SCE & PS) for VSP Thien Ung Wellhead Platform (associated with Global Maritime Vietnam) | Vietsovpetro/PV Engineering | 2014 |
36. | Provision of QRA for Eastern Jason Federal II FSO Conversion. (associated with Global Maritime Vietnam) | Eastern Jason | 2014 |
37. | Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier (including SMP, QRA, and ERP) for Drilling Campaign 2014 – TGT-H1&H4 | Hoang Long JOC | 2014 |
38. | Provision of QRA for oil and gas production at HVJOC Ca Ngu Vang Field after 5 years in operation | Hoan Vu Joint Operating Company (HVJOC) | 2013 |
39. | Provision of QRA review for increased capacity of HLJOC FPSO | Hoang Long Joint Operating Company (HLJOC) | 2013 |
40. | Provision of HAZOP and QRA Studies for modification of FSO Widuri project | Global Maritime | 2013 |
41. | Provision of HAZOP implementation review and QRA Study for HLJOC H04 Wellhead Platform | Hoang Long Joint Operating Company (HLJOC) | 2011 |
42. | Provision of Update QRA for JVPC Wellhead Platform E1 | Japan Vietnam Petroleum Company (JVPC) | 2011 |
43. | Provision of QRA at Song Doc Prive MV19 | Truong Son JOC | 2011 |