No. |
PROJECT DESCRIPTION |
PROJECT OWNER/CLIENT |
COMPLETION YEAR |
1 |
Provision of Legislations of Safety Management Program, develop Quantitative Risk Assessment and Emergency Response Plan for Drilling Campaign(s) in Hai Su Trang and/or Hai Su Den fields |
Thang Long JOC |
In proccess |
2 |
Provision of Safety Documentation Management Service for Block 06.1, PLDDC-1X Exploration Drilling Program |
Rosneft Vietnam B.V. |
In proccess |
3 |
Provision of Safety Management Program Development for Ca Mau Fertilizer Plant |
Petrovietnam Camau Fertilizer Joint Stock Company |
(in progress) |
4 |
Provision of consultancy service in obtaining the approval from PVN and MOIT for PLD Development Fabrication and Installation Activities and Update Safety Management Dossier for Lan Tay Platform Operation with PLD Modification |
Rosneft Vietnam B.V. |
(in progress) |
5 |
Provision of consultancy service in obtaining the approval from PVN and MOIT for safety Management Dossier including Risk Assessment report and safety management program for FSO Rang Dong MV17 mooring leg replacement Project |
Japan Vietnam Petroleum Company |
2018 |
6 |
Provision of Safety Management Dossier for Approval of PVN & MOIT on drilling activities with two rig offshore drilling campaign for well TTN-1X, PLD-1X and LND-3P in Blocks 05.3/11 and 06.1 in compliance with Decision 04/2015/QD-TTg |
Rosneft Vietnam B.V. |
2017 |
7 |
Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier for Gas Processing Plant |
PV Gas Ca Mau |
2017 |
8 |
Provision of Safety and Environment Package acquisition of MoIT/ PVN approval for to Murphy’s 2017 Exploration Drilling Campaign – Phase 2 in Block 11-2/11 |
Murphy Phuong Nam Oil Co., Ltd. |
2017 |
9 |
Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier (including SMP and QRA) for CLJOC Su Tu Trang Full Field Development Phase 1 – Detailed Engineering |
Cuu Long Joint Operating Company (CLJOC) |
2016 |
10 |
Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier (including SMP, QRA, and ERP) for TNK Vietnam 2016 Drilling Campaign |
TNK Vietnam B.V (a subsidiary of Rosneft) |
2015 |
11 |
Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier (including QRA and SMP) for modifications of JVPC NULQ Platform |
Japan Vietnam Petroleum Company (JVPC) |
2015 |
12 |
Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier (including SMP, integrated QRA, and ERP) for operations at LSJOC Thang Long – Dong Do Field |
Lam Son Joint Operating Company (LSJOC) |
2014 |
13 |
Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier (including SMP and QRA) for CLJOC Su Tu Vang South West Platform |
Cuu Long Joint Operating Company (CLJOC) |
2014 |
14 |
Preparation and acquisition of MoIT/ PVN approval for Safety Management Dossier (including SMP, QRA, and ERP) for Drilling Campaign 2014 – TGT-H1&H4 |
Hoang Long JOC |
2014 |