| 1. |
Conduct HAZOP Public Training |
Many customers |
2019 |
| 2. |
Provision of HAZOP/HAZID studies for Su Tu Nau Well Pressure Reduction Project |
Bureau Veritas |
2019 |
| 3. |
Provision of revalidation HAZOP review for Hon Chong Cement Production Line and Waste Heat Recovery System |
SIAM CITY CEMENT (VIETNAM) |
2019 |
| 4. |
Conduct HAZOP Public Training |
Many customers |
2019 |
| 5. |
Provision of Developing and Update Operational Safety Case, QRA and HAZOP, HAZID, SIL and safety studies for FPSO MV34 |
MODEC Offshore Production Systems (Singapore) Pte. Ltd |
(in progress) |
| 6. |
Provision of HAZID & HAZOP Services for Fix platform BK 20 |
VietsovPetro |
2018 |
| 7. |
Provision of HAZOP revalidation, Quantitative Risk Assessment, Safety Case Update and Integrity review service for WHP-MT1, WHP-HT1 and PQP-HT |
Bien Dong POC |
2018 |
| 8. |
Provision of HAZOP Service for New Expansion Project |
Vopak Vietnam Co., Ltd |
2018 |
| 9. |
Provision of HAZID and HAZOP for Extension of Gas Compression Capacity at Block 09-1, install train A on MKS project |
Vietsovpetro |
2018 |
| 10. |
Provision of HAZID and HAZOP for CTC1 Platform – Ca Tam Field |
Vietsovpetro |
2018 |
| 11. |
Provision of HAZOP training |
Vietsovpetro |
2017 |
| 12. |
Provision of HAZOP training |
Nestle Vietnam Co., Ltd. |
2017 |
| 13. |
Provision of Operation HSE Cases and QRA for Su Tu Field Facilities (include 5 Operation Safety Case WHP-A; WHP-B; STT Facilities; STV CPP; TBVN FPSO) |
Cuu Long Joint Operating Company |
2017 |
| 14. |
Provision of HAZOP study for Polymer Modified Bitumen (PMB) system and Hot Oil system |
PUMA Energy Bitumen Vietnam Limited |
2017 |
| 15. |
Provision of HAZOP study for Low Pressure Gas Distribution System for Intermalt Plant |
JPS Gas solution |
2017 |
| 16. |
Provision of HAZOP for Solvent Plant – Hai Phong Terminal Project |
168 TECHNOLOGY JSC |
2017 |
| 17. |
Provision of Safety Assessment Services (including HAZID, HAZOP, SIL, FERA, NHRA, and QRA Studies) for CLJOC Su Tu Field |
Cuu Long Joint Operating Company |
2017 |
| 18. |
Provision of HAZOP/ SIL/ LOPA for Annulus Overpressure Protection |
Cuu Long Joint Operating Company (CLJOC) |
2016 |
| 19. |
Provision of Safety Studies (HAZOP/HAZID/SIL/FEA/QRA) for H1-WHP platform modification – water treatment system |
Hoang Long Joint Operating Company (HLJOC) |
2016 |
| 20. |
Provision of HAZOP and HAZID Study Services Upgrade of Vuda diesel excellium AC 1209 system and Upgrade of Walu Bay Terminal truck loading gantry and excellium tanks in Fiji Island |
Tebodin Vietnam Co., Ltd. |
2016 |
| 21. |
Provision of HAZOP study for Bituminous Emulsion Plant – Dinh Vu Bitumen Terminal, Hai Phong Province. |
Puma Energy Bitumen Vietnam Company |
2016 |
| 22. |
Provision of HAZOP study for STN Production Debottleneck – Routing STN produced water through WI pipeline. |
Cuu Long Joint Operating Company (CLJOC) |
2016 |
| 23. |
Provision of HAZOP study for Holcim Cement Production Line and Waste Heat Recovery Power Plant |
Holcim Vietnam Limited |
2016 |
| 24. |
Provision of HAZOP Study, HAZID – Risk Assessment, and ERP for CLJOC FPSO TBVN turret swivel overhaul |
Cuu Long JOC / PV Engineering |
2016 |
| 25. |
Provision of HAZOP Study for Total Cambodge atmospheric tank systems |
Total Cambodge/ Tebodin Vietnam |
2015 |
| 26. |
Provision of Safety Studies (including HAZOP, HAZID, and SIL) for new loop pipeline at Ca Mau Gas Processing Plant |
PV Gas/ PV Engineering |
2015 |
| 27. |
Provision of HAZOP Study for lube oil blending plant at Shell Go Dau Terminal |
Shell/SGS Vietnam |
2014 |
| 28. |
Provision of HAZOP Study for booster compressor package for CPOC MDB Wellhead Platform (associated with Global Maritime Vietnam) |
Carigali-PTTEP Operating Company Sdn Bhd/ Technics Offshore Engineering |
2014 |
| 29. |
Provision of HAZOP Study for PV Gas Tien Hai – Thai Binh low pressure gas distribution pipeline system (associated with Global Maritime Vietnam) |
PV Gas/PV Engineering |
2014 |
| 30. |
Provision of HAZOP Study for LSJOC ESP gas lift line (associated with Global Maritime Vietnam) |
Lam Son Joint Operating Company (LSJOC) |
2014 |
| 31. |
Provision of HAZOP Study for VSP-02 vapor recovery (associated with Global Maritime Vietnam) |
Vietsovpetro/PV Engineering |
2014 |
| 32. |
Provision of Safety Studies (including QRA, HAZOP, HAZID) for VSP Wellhead Platform A (associated with Global Maritime Vietnam) |
Vietsovpetro/PV Engineering |
2014 |
| 33. |
Provision of Safety Studies (including HAZOP, HAZID) for produced water system on PVD Wellhead Platform A (associated with Global Maritime Vietnam) |
PVD Trading & Technical Services |
2014 |
| 34.
|
Provision of HAZOP Study for Dinh Vu LPG terminal extension (associated with Global Maritime Vietnam) |
PV Gas/ PV Engineering |
2014 |
| 35. |
Provision of HAZOP Study for cross over the line at LSJOC Thang Dong – Dong Do Field (associated with Global Maritime Vietnam) |
Lam Son Joint Operating Company (LSJOC) |
2014 |
| 36. |
Provision of HAZOP Study for CNOOC FSO Federal II Conversion. (associated with Global Maritime Vietnam) |
Federal Offshore |
2014 |
| 37. |
Provision of HAZOP Study for gas injection compression system for JVPC Rang Dong Field |
Japan Vietnam Petroleum Company (JVPC) |
2013 |
| 38. |
Provision of HAZOP Study for Holcim Vietnam waste heat recovery power plant (new plant) |
Holcim Vietnam |
2013 |
| 39. |
Provision of Revalidation HAZOP for KNOC Rong Doi Gas Platform after five years in operation |
Korea National Oil Corporation (KNOC) |
2013 |
| 40. |
Provision of Safety Studies (including HAZOP, HAZID, and SIL) for CLJOC Su Tu Trang debottlenecking – Stage 2 |
Cuu Long JOC/PV Engineering |
2013 |
| 41. |
Provision of HAZOP and QRA Studies for modification of FSO Widuri project |
Global Maritime |
2013 |
| 42. |
Provision of HAZOP Studies for modification of STT-WHP project |
PVE |
2013 |
| 43. |
Provision of HAZOP Study for Thai Binh Field Development |
PETRONAS/PV Engineering |
2012 |
| 44. |
Provision of HAZOP implementation review and QRA Study for HLJOC H04 Wellhead Platform |
Hoang Long Joint Operating Company (HLJOC) |
2011 |
| 45. |
Provision of Safety Studies (including HAZOP and HAZID) for Nam Con Son II gas pipeline –offshore Section |
PV Gas /Bureau Veritas |
2012 |
| 46. |
Provision of Safety Studies (including HAZOP and HAZID) for modification of Christmas Tree at HLJOC Te Giac Trang Field |
Hoang Long Joint Operating Company (HLJOC) |
2012 |
| 47. |
Provision of HAZOP and SIL Studies for equipment in Nam Con Son Plant. |
PVGas |
2012 |
| 48. |
Provision of HAZOP/HAZID studies for the Gas compressor in Ca Mau Gas Processing Plant at Mui Tram station |
PVE |
2012 |
| 49. |
Provision of HAZOP Study on FPSO hook-up |
APL/Global Maritime |
2011 |
| 50.
|
Provision of two (02) HAZOP Studies for LPG terminal – FEED and Detailed Design |
Vinabenny Energy JSC |
2010-2011 |
| 51. |
Provision of HAZOP Study for a Gas Project including 3 wellhead platforms and modification work for onshore gas terminal |
Bureau Veritas |
2011 |
| 52. |
Provision of HAZOP Study for CLJOC Su Tu Den phase 1 Field Development, Well Twinning Wellhead Platform A |
Cuu Long Joint Operating Company (CLJOC) |
2010 |
| 53. |
Provision of HAZID and HAZOP Studies and preparation of Bridging Document for TSJOC SDA-NH1P Well Intervention Project |
Truong Son Joint Operating Company (TSJOC) |
2009 |
| 54. |
Provision of HAZOP Study for WLDP-B Workover Project, West Lutong Field |
Bureau Veritas |
2008 |
| 55. |
Provision of HAZOP Study for BNDP-A Workover Project |
Bureau Veritas |
2008 |
| 56. |
Provision of HAZOP Study for BAP-B/BAKP-B Link Line Project, Batam Field |
Bureau Veritas |
2008 |
| 57. |
Provision of HAZOP Study for As-Built West Lutong Field offshore |
Bureau Veritas |
2008 |
| 58. |
Provision of HAZOP study for thermal relief valve installation project – Miri crude oil plant |
Malaysia |
2008 |