No. | Project Description | Project Owner/ Client | Completion Year |
1. | Conduct HAZOP Public Training | Many customers | 2019 |
2. | Provision of HAZOP/HAZID studies for Su Tu Nau Well Pressure Reduction Project | Bureau Veritas | 2019 |
3. | Provision of revalidation HAZOP review for Hon Chong Cement Production Line and Waste Heat Recovery System | SIAM CITY CEMENT (VIETNAM) | 2019 |
4. | Conduct HAZOP Public Training | Many customers | 2019 |
5. | Provision of Developing and Update Operational Safety Case, QRA and HAZOP, HAZID, SIL and safety studies for FPSO MV34 | MODEC Offshore Production Systems (Singapore) Pte. Ltd | (in progress) |
6. | Provision of HAZID & HAZOP Services for Fix platform BK 20 | VietsovPetro | 2018 |
7. | Provision of HAZOP revalidation, Quantitative Risk Assessment, Safety Case Update and Integrity review service for WHP-MT1, WHP-HT1 and PQP-HT | Bien Dong POC | 2018 |
8. | Provision of HAZOP Service for New Expansion Project | Vopak Vietnam Co., Ltd | 2018 |
9. | Provision of HAZID and HAZOP for Extension of Gas Compression Capacity at Block 09-1, install train A on MKS project | Vietsovpetro | 2018 |
10. | Provision of HAZID and HAZOP for CTC1 Platform – Ca Tam Field | Vietsovpetro | 2018 |
11. | Provision of HAZOP training | Vietsovpetro | 2017 |
12. | Provision of HAZOP training | Nestle Vietnam Co., Ltd. | 2017 |
13. | Provision of Operation HSE Cases and QRA for Su Tu Field Facilities (include 5 Operation Safety Case WHP-A; WHP-B; STT Facilities; STV CPP; TBVN FPSO) | Cuu Long Joint Operating Company | 2017 |
14. | Provision of HAZOP study for Polymer Modified Bitumen (PMB) system and Hot Oil system | PUMA Energy Bitumen Vietnam Limited | 2017 |
15. | Provision of HAZOP study for Low Pressure Gas Distribution System for Intermalt Plant | JPS Gas solution | 2017 |
16. | Provision of HAZOP for Solvent Plant – Hai Phong Terminal Project | 168 TECHNOLOGY JSC | 2017 |
17. | Provision of Safety Assessment Services (including HAZID, HAZOP, SIL, FERA, NHRA, and QRA Studies) for CLJOC Su Tu Field | Cuu Long Joint Operating Company | 2017 |
18. | Provision of HAZOP/ SIL/ LOPA for Annulus Overpressure Protection | Cuu Long Joint Operating Company (CLJOC) | 2016 |
19. | Provision of Safety Studies (HAZOP/HAZID/SIL/FEA/QRA) for H1-WHP platform modification – water treatment system | Hoang Long Joint Operating Company (HLJOC) | 2016 |
20. | Provision of HAZOP and HAZID Study Services Upgrade of Vuda diesel excellium AC 1209 system and Upgrade of Walu Bay Terminal truck loading gantry and excellium tanks in Fiji Island | Tebodin Vietnam Co., Ltd. | 2016 |
21. | Provision of HAZOP study for Bituminous Emulsion Plant – Dinh Vu Bitumen Terminal, Hai Phong Province. | Puma Energy Bitumen Vietnam Company | 2016 |
22. | Provision of HAZOP study for STN Production Debottleneck – Routing STN produced water through WI pipeline. | Cuu Long Joint Operating Company (CLJOC) | 2016 |
23. | Provision of HAZOP study for Holcim Cement Production Line and Waste Heat Recovery Power Plant | Holcim Vietnam Limited | 2016 |
24. | Provision of HAZOP Study, HAZID – Risk Assessment, and ERP for CLJOC FPSO TBVN turret swivel overhaul | Cuu Long JOC / PV Engineering | 2016 |
25. | Provision of HAZOP Study for Total Cambodge atmospheric tank systems | Total Cambodge/ Tebodin Vietnam | 2015 |
26. | Provision of Safety Studies (including HAZOP, HAZID, and SIL) for new loop pipeline at Ca Mau Gas Processing Plant | PV Gas/ PV Engineering | 2015 |
27. | Provision of HAZOP Study for lube oil blending plant at Shell Go Dau Terminal | Shell/SGS Vietnam | 2014 |
28. | Provision of HAZOP Study for booster compressor package for CPOC MDB Wellhead Platform (associated with Global Maritime Vietnam) | Carigali-PTTEP Operating Company Sdn Bhd/ Technics Offshore Engineering | 2014 |
29. | Provision of HAZOP Study for PV Gas Tien Hai – Thai Binh low pressure gas distribution pipeline system (associated with Global Maritime Vietnam) | PV Gas/PV Engineering | 2014 |
30. | Provision of HAZOP Study for LSJOC ESP gas lift line (associated with Global Maritime Vietnam) | Lam Son Joint Operating Company (LSJOC) | 2014 |
31. | Provision of HAZOP Study for VSP-02 vapor recovery (associated with Global Maritime Vietnam) | Vietsovpetro/PV Engineering | 2014 |
32. | Provision of Safety Studies (including QRA, HAZOP, HAZID) for VSP Wellhead Platform A (associated with Global Maritime Vietnam) | Vietsovpetro/PV Engineering | 2014 |
33. | Provision of Safety Studies (including HAZOP, HAZID) for produced water system on PVD Wellhead Platform A (associated with Global Maritime Vietnam) | PVD Trading & Technical Services | 2014 |
34.
|
Provision of HAZOP Study for Dinh Vu LPG terminal extension (associated with Global Maritime Vietnam) | PV Gas/ PV Engineering | 2014 |
35. | Provision of HAZOP Study for cross over the line at LSJOC Thang Dong – Dong Do Field (associated with Global Maritime Vietnam) | Lam Son Joint Operating Company (LSJOC) | 2014 |
36. | Provision of HAZOP Study for CNOOC FSO Federal II Conversion. (associated with Global Maritime Vietnam) | Federal Offshore | 2014 |
37. | Provision of HAZOP Study for gas injection compression system for JVPC Rang Dong Field | Japan Vietnam Petroleum Company (JVPC) | 2013 |
38. | Provision of HAZOP Study for Holcim Vietnam waste heat recovery power plant (new plant) | Holcim Vietnam | 2013 |
39. | Provision of Revalidation HAZOP for KNOC Rong Doi Gas Platform after five years in operation | Korea National Oil Corporation (KNOC) | 2013 |
40. | Provision of Safety Studies (including HAZOP, HAZID, and SIL) for CLJOC Su Tu Trang debottlenecking – Stage 2 | Cuu Long JOC/PV Engineering | 2013 |
41. | Provision of HAZOP and QRA Studies for modification of FSO Widuri project | Global Maritime | 2013 |
42. | Provision of HAZOP Studies for modification of STT-WHP project | PVE | 2013 |
43. | Provision of HAZOP Study for Thai Binh Field Development | PETRONAS/PV Engineering | 2012 |
44. | Provision of HAZOP implementation review and QRA Study for HLJOC H04 Wellhead Platform | Hoang Long Joint Operating Company (HLJOC) | 2011 |
45. | Provision of Safety Studies (including HAZOP and HAZID) for Nam Con Son II gas pipeline –offshore Section | PV Gas /Bureau Veritas | 2012 |
46. | Provision of Safety Studies (including HAZOP and HAZID) for modification of Christmas Tree at HLJOC Te Giac Trang Field | Hoang Long Joint Operating Company (HLJOC) | 2012 |
47. | Provision of HAZOP and SIL Studies for equipment in Nam Con Son Plant. | PVGas | 2012 |
48. | Provision of HAZOP/HAZID studies for the Gas compressor in Ca Mau Gas Processing Plant at Mui Tram station | PVE | 2012 |
49. | Provision of HAZOP Study on FPSO hook-up | APL/Global Maritime | 2011 |
50.
|
Provision of two (02) HAZOP Studies for LPG terminal – FEED and Detailed Design | Vinabenny Energy JSC | 2010-2011 |
51. | Provision of HAZOP Study for a Gas Project including 3 wellhead platforms and modification work for onshore gas terminal | Bureau Veritas | 2011 |
52. | Provision of HAZOP Study for CLJOC Su Tu Den phase 1 Field Development, Well Twinning Wellhead Platform A | Cuu Long Joint Operating Company (CLJOC) | 2010 |
53. | Provision of HAZID and HAZOP Studies and preparation of Bridging Document for TSJOC SDA-NH1P Well Intervention Project | Truong Son Joint Operating Company (TSJOC) | 2009 |
54. | Provision of HAZOP Study for WLDP-B Workover Project, West Lutong Field | Bureau Veritas | 2008 |
55. | Provision of HAZOP Study for BNDP-A Workover Project | Bureau Veritas | 2008 |
56. | Provision of HAZOP Study for BAP-B/BAKP-B Link Line Project, Batam Field | Bureau Veritas | 2008 |
57. | Provision of HAZOP Study for As-Built West Lutong Field offshore | Bureau Veritas | 2008 |
58. | Provision of HAZOP study for thermal relief valve installation project – Miri crude oil plant | Malaysia | 2008 |